Under PM-KUSUM the central government pays 30% of the cost of a solar pump and the state pays at least 30%, so you pay about 40%. In the North-East, hill states and island UTs the central share is 50%, so you pay about 20%. A bank can lend part of your share. Check the 2026 status first, because the first phase of the scheme is ending.
PM-KUSUM Solar Pump Subsidy Calculator
Enter the benchmark or tender cost of your pump to see the central and state subsidy and your own share. рд╕реЛрд▓рд░ рдкрдВрдк рдкрд░ рдХрд┐рддрдиреА рд╕рдмреНрд╕рд┐рдбреА, рдЖрдкрдХреЛ рдХрд┐рддрдирд╛ рджреЗрдирд╛ рд╣реЛрдЧрд╛, рддреБрд░рдВрдд рджреЗрдЦреЗрдВред
Free estimate, not approval. PM-KUSUM: central 30% (50% in NE, hill and island areas) plus state 30% of the benchmark or tender cost, whichever is lower. Checked 13 Oct 2026.
Worked example: тВ╣3 lakh solar pump
Say the benchmark cost of the pump in your state is тВ╣3 lakh (only an example; the real figure depends on pump size and your state tender). The centre pays тВ╣90,000 (30%) and the state тВ╣90,000 (30%), so your share is тВ╣1.2 lakh. If a bank lends 30% of the cost (тВ╣90,000), you pay only тВ╣30,000 upfront and repay the loan later. In a hill state the centre pays тВ╣1.5 lakh and your share is тВ╣60,000.
PM-KUSUM 2026: is it still open?
| Item | Status on 13 Oct 2026 |
|---|---|
| First phase (Components A, B, C) | Due to end 31 Mar 2026 |
| Projects already sanctioned | Completion extended to 31 Mar 2027 (MNRE, as reported in Mar 2026) |
| New solar pump applications | Only where your state still has sanctioned pumps left; check with your state nodal agency |
| PM-KUSUM 2.0 | Announced (with a 10 GW agri-PV part), not notified yet |
| Official website | pmkusum.mnre.gov.in (and your state nodal agency) |
| MNRE helpline | 1800-180-3333 |
Beware of fake KUSUM websites
MNRE has warned many times about fake websites and WhatsApp messages that ask farmers for a “registration fee” for a KUSUM pump. The official site ends in .gov.in. Do not pay money or share Aadhaar or bank details on any other site.
PM-KUSUM subsidy rules
| Rule | What it says |
|---|---|
| Component B | New standalone (off-grid) solar pump |
| Component C | Solarising your existing grid-connected pump |
| Central help (CFA) | 30% of benchmark or tender cost, whichever is lower |
| North-East, hill states/UTs, island UTs | Central help 50% |
| State help | At least 30%; some states give more |
| Farmer share | About 40% (20% in NE/hill/island) |
| Bank loan | Banks may lend up to 30% of the cost, so you pay about 10% upfront |
How to apply
- Find your state nodal agency (for example UPNEDA in Uttar Pradesh, GEDA in Gujarat, RRECL in Rajasthan) and check if applications are open.
- Apply only on the state agency or pmkusum.mnre.gov.in link.
- Keep Aadhaar, land records, bank passbook, photo and, for Component C, your electricity connection details.
- Pay your share only after you get the official approval or demand letter.
- An empanelled vendor installs the pump; the subsidy goes to the vendor or your account as per state rules.
PM-KUSUM solar pump: frequently asked questions
How much subsidy is given on a solar pump under PM-KUSUM? The centre gives 30% and the state at least 30%, so the subsidy is about 60% and you pay about 40%. In North-East, hill and island areas the centre gives 50%, so you pay about 20%.
Is PM-KUSUM still open in 2026? The first phase was due to end on 31 Mar 2026. Already-sanctioned projects have until 31 Mar 2027 (as reported). New applications depend on your state. PM-KUSUM 2.0 has been announced but not notified as of 13 Oct 2026.
Do I have to pay only 10% for a KUSUM pump? Only if a bank lends you 30% of the cost. Your real share is about 40%; the 10% is what you pay upfront, and you repay the loan.
Is the subsidy on the vendor price? No. It is on the benchmark cost or the tender cost, whichever is lower. If the vendor charges more, you pay the extra.
Where do I apply for PM-KUSUM? At your state nodal agency (for example UPNEDA, GEDA, RRECL) or through pmkusum.mnre.gov.in. Never pay a registration fee on other websites.
What is PM-KUSUM 2.0? It is the next phase the government has announced, with more focus on solarising feeders and a 10 GW agri-PV part. Rules and subsidy rates are not notified yet. We will update this page when they are.
Sources: MNRE PM-KUSUM FAQ (30% central + 30% state, 50% central in NE/hill/island, on the lower of benchmark or tender cost); SBI PM-KUSUM loan page (10% farmer margin, bank finance); MNRE public advisories on fake websites (helpline 1800-180-3333); reports in Renewable Watch and Energetica India (Mar 2026 timeline extension) and Down To Earth (PM-KUSUM 2.0). Official PDFs could not be opened from our server on 13 Oct 2026, so the status is marked as reported. Estimate, not approval.
More free tools: Drip irrigation subsidy ┬╖ KCC loan limit ┬╖ Polyhouse subsidy ┬╖ All farm tools ┬╖ PM рд╕реВрд░реНрдп рдШрд░ рд╕рдмреНрд╕рд┐рдбреА рд╕реНрдЯреЗрдЯрд╕